ResearchSkybitOpen app

How do I separate forecasting edge from execution performance in trading P&L?

By Skybit Research · Published · Updated
Sources verified Nov 3, 2026.

Record p-hat and a frozen benchmark before the order, then decompose realized P&L into forecast edge, execution versus benchmark, outcome residual, fees/rebates, and locked-capital funding. Keep resolution timing separate from mark-to-market exposure. The bridge applies to event contracts; scope venue rules and fee schedules to Kalshi, Polymarket international, or Polymarket US, and keep combo fees separate from standard single-contract fees.

Define the attribution ledger before the trade

At order time, log contract ID, venue, side, signed quantity, decision timestamp, your probability p-hat, and a benchmark b. Freeze these fields before sending the order. For a Kalshi YES order, b can be the midpoint of best YES bid and implied YES ask; Kalshi publishes bids only, so the implied YES ask is $1 minus the highest NO bid. Choose midpoint or executable VWAP, never both.

Scope the fee and resolution fields to the venue. The worked example uses Polymarket US standard taker fees: Fee = Θ × C × p × (1 − p), with Θ = 0.0695. Polymarket US now flags a combo taker curve change effective 10:00 PM ET, October 28, 2026, but the 0.0695 standard term is unchanged, so a single event-contract trade is unaffected. Keep combo fills separate.

Sources: [1] [2]

Build the P&L bridge with signed quantities

For a long YES position held to settlement, gross P&L per contract is S minus fill, where S is $1 or $0. Decompose it as (S − p-hat) + (p-hat − b) + (b − fill). The first term is outcome residual versus forecast, the second is ex-ante forecast edge versus the decision benchmark, and the third is execution slippage. Subtract fees and funding, then add rebates after the gross bridge so every dollar has one owner.

For a sell or NO position, use signed quantity q: positive for long YES, negative for short YES. Convert p-hat, b, and fill to YES-equivalent units before applying the bridge. Then P&L = q[(S − p-hat) + (p-hat − b) + (b − fill)] − fees + rebates − funding. A negative q flips every bridge term; keep the sign convention in the data model, not a spreadsheet note.

Treat resolution and locked capital as separate clocks

Locked capital is cash committed to a position; unresolved exposure is the mark-to-market and outcome risk still open. On Polymarket international, prediction markets use UMA: an undisputed proposal resolves in about two hours, while a disputed one takes four to six days. Up-down markets use Chainlink TWAP and bypass UMA's proposal-and-dispute process. That changes funding cost and capital availability, not the forecast.

Winning tokens redeem for $1 and losing tokens for $0, so settlement converts locked capital into realized P&L only after resolution. A disputed UMA market can keep capital locked for days after the event; report that as funding cost, not forecasting alpha. Show locked capital and unresolved exposure as two lines, and do not pool settlement-timing costs with execution slippage.

Sources: [3]

Worked example and operating checklist

Hypothetical: buy 100 YES at $0.43 with p-hat 0.55 and midpoint b $0.44. Forecast edge is (0.55 − 0.44) × 100 = $11.00. Execution is (0.44 − 0.43) × 100 = $1.00 before fees. If YES settles, outcome residual is (1 − 0.55) × 100 = $45.00; total gross is $57.00, matching (1 − 0.43) × 100. Polymarket US standard taker fee at $0.43 is 0.0695 × 100 × 0.43 × 0.57 = $1.70, rounded.

If capital is locked 30 days at a hypothetical 5% annual rate, funding cost is 0.05 × $43.00 × 30/365 = $0.18; net P&L is $57.00 − $1.70 − $0.18 = $55.12. Checklist: log p-hat before order; store b and its timestamp; reconcile fills against b; book fees/rebates at fill; accrue funding for locked capital; mark unresolved positions separately; and tag UMA, Chainlink TWAP, venue, and combo versus standard fee curve.

Sources: [2] [3]

Attribution bridge for a long YES event-contract position
Bridge componentLong YES formulaDecision it supports
Forecast edge at decision(p-hat − b) × QDid the probability estimate beat the pre-trade benchmark?
Execution vs benchmark(b − fill) × QDid order placement and spread help or hurt before fees?
Fees and rebates−fees + rebatesDid venue schedule and maker/taker role help or hurt?
Outcome residual(S − p-hat) × QWas the forecast right after removing price and fills?
Locked-capital costr × locked cash × days/365What did resolution delay or collateral lock cost?

Assumptions and scope

  • All worked-example prices, probabilities, quantities, settlement outcomes, and the 5% annual funding rate are synthetic and hypothetical.
  • The long-YES bridge assumes one event contract settles at $1 or $0, with no partial settlement unless the market rules specify otherwise.
  • The benchmark b is chosen before execution and held fixed; midpoint and executable VWAP are not mixed in one attribution run.
  • The fee calculation uses the Polymarket US standard taker schedule only, not Kalshi or Polymarket international schedules, and ignores promotions or intermediary charges.

Sources and verification

  1. Kalshi order book conventions
    Source checked Nov 3, 2026.
  2. Polymarket US fee schedule
    Source checked Nov 3, 2026.
  3. Polymarket resolution mechanisms
    Source checked Nov 3, 2026.

Prepared by Skybit Research with AI assistance and automated source checks. Examples and assumptions are identified in the article. No human reviewer is implied. Check the exact contract and current venue documentation before applying a method.